
New TopShim run:

version = topshim 2.0.0
date = 2022-08-03
time = 16:31:37.363
command = topshim  fine convcomp tunea

FINE SHIMMING

Parameters:

probe = Z116098_0473
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.7 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  3: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  5: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  6: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  7: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.5 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, spinning) = 0.431


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-282
Z2	-119
Z3	-113
Z4	-758
Z5	+28
Z6	+644
Z7	-1394
Z8	-6600

duration = 2 min 30 sec
completed successfully
finished Wed Aug 03 16:34:06 2022


========================================================================
