
New TopShim run:

version = topshim 2.0.0
date = 2022-09-21
time = 14:53:16.999
command = topshim  fine convcomp tunea

FINE SHIMMING

Parameters:

probe = Z116098_0473
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.8 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  6: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.5 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, spinning) = 0.439


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-30
Z2	+1
Z3	-28
Z4	-162
Z5	+77
Z6	+427
Z7	-493
Z8	-490

duration = 2 min 40 sec
completed successfully
finished Wed Sep 21 14:55:55 2022


========================================================================
