
New TopShim run:

version = topshim 4.4.1
date = 2025-11-04
time = 10:11:44.921
command = topshim 

FINE SHIMMING

Parameters:

probe = Z163739_1118
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 1.6 Hz, Target= 0.5 Hz, After= 1.0 Hz
Iteration 2: FWHM Before= 1.0 Hz, Target= 0.6 Hz, After= 0.6 Hz
Iteration 3: FWHM Before= 0.6 Hz, Target= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.81

shim changes: 
Z	-73
Z2	-19
Z3	+5
Z4	-206
Z5	-60

duration = 1 min 47 sec
completed successfully
finished Tue Nov  4 10:13:31 2025


========================================================================
