New TopShim run:

version = topshim 2.4.0
date = 2024-12-03
time = 12:43:07.564
command = topshim 

FINE SHIMMING

Parameters:

probe = Z135420_0012
solvent = DMSO
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 2.49 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.3 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration  2: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.7 Hz
Iteration  5: FWHM Before= 0.7 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  6: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.658

shim changes: 
Z	-5
Z2	-5
Z3	+13
Z4	+73

duration = 1 min 34 sec
completed successfully
finished Tue Dec 03 12:44:40 2024


========================================================================